We are presently working on the bunkers, mostly eliminating some that are out of play, filling in some deep grass bunkers and sifting/refilling with sand those that we keep. This project should be completed by the end of August 2013.
Greens didn't get much attention after Hurricane Maria, too much debris all over but this year we are hitting HARD!!!!!! 5/8 / 2 inch spacing @ 4 inch depth triple verticut thatch OUT !!!!!! Needle tines Fertilizer and amendments THE GOOD STUFF !!!!!!!! Topdress 323 Silica 20 tons.......... Blower work it IN!!!! Watering and wetting agents!!!!!!! NEXT week. Deeptine (Vertidrain 1/2 inch solid @ 6 inch depth)
Found a leak on green 10 realized that someone built this green 20 years ago and didn't reroute the main line. 4 inch pipe under green now going around the left and around towards the irrigation control valve box. And it was done during SEASON 2019/2020 member excited NOT!!!!!!!!! 😊